Home > Articles > Highlights > 2022 > Enhancements at Buona Vista and Commonwealth to Support Future Commuter & Traffic Demands

Enhancements at Buona Vista and Commonwealth to Support Future Commuter & Traffic Demands

1        Works to enhance the road networks and commuter infrastructure in Buona Vista and Commonwealth will commence from 2024 to support new residential, business, and mixed-use developments in the area including Build-To-Order Projects in Ulu Pandan and Ghim Moh, Biopolis Phase 6, as well as One Holland Village. The works will improve the traffic flow and walkability in the area in view of future commuter and traffic demand.

 

2        When the works are completed by 2028, residents in Dover, Ghim Moh, Holland Drive and Holland Avenue, commuters and motorists can look forward to better intra-town and inter-town connectivity, shorter commutes, and safer barrier-free pedestrian crossings. Cyclists can also look forward to better connectivity, including to the Rail Corridor.

 

3        The Land Transport Authority (LTA) will be calling the tender in 2023 for these improvements:

    1. Covered linkway from Buona Vista and Commonwealth MRT Stations to nearby bus stops;
    2. Lifts at two existing pedestrian overhead bridges – one across North Buona Vista Road and another across Commonwealth Avenue;
    3. Reconfiguration of footpaths and cycling paths, including ramps to connect Commonwealth Avenue and Commonwealth Avenue West to the Rail Corridor; and
    4. Road enhancement at the junction of Commonwealth Avenue West, North Buona Vista Road and Commonwealth Avenue.

 

 

Land Acquisition

4        To facilitate works in the area of the junction of Commonwealth Avenue West, North Buona Vista Road and Commonwealth Avenue, a strip of land at the fringe of The Metropolis (mainly planting strip) of approximately 269.1sqm (approximately 1.5% of the total land area) will be acquired by the Government. Existing building structures will not be affected. The Singapore Land Authority (SLA) has gazetted the acquisition of the affected land today. SLA and LTA will work closely with the affected landowner and assist them through the acquisition process.

 

5        The notification of the land affected by the acquisition has been published in the Gazette of 11 Jan 2023. The Gazette Notification No. 81 dated 21 Dec 2022 may be found online at www.egazette.com.sg. The affected private land is listed below:

 

Mukim

Lot Number

Extent of Acquisition

Area in sqm

Relevant Street Address

3

4761A

Part

269.1 (sc)

9 and 11 North Buona Vista Drive

 

6        The plan of the affected land may be inspection during normal office hours at the office of the Collector of Land Revenue, Singapore Land Authority from Monday to Friday except Public Holidays. Any person who wishes to claim an interest in compensation on account of the acquisition, but has not received an acquisition notice, may contact the office of the Collector of Land Revenue, Singapore Land Authority at 1800 323 9829 to arrange for an inquiry to state the nature of his interests in the land, the amount and particulars of his claims to compensation for his interest, the basis or mode of valuation by which the amount claimed is arrived at and his objections, if any, to the measurements of the land.

 

7        Should you require additional information, you may contact Singapore Land Authority at 1800 323 9829.